fbpx
The Parc pool
50m Olympic Swimming Pool The Parc
+62 21 749 8999
News 03/06/2021

The Parc Site Progress (May 2021)

SouthCity is still continuing the construction of The Parc apartment with the aim of completing on time. Currently, the casting stage for the 1st floor of tower A and the basement 1 floor structure has been completed.

The Parc is a modern urban apartment built with the best environmentally friendly design and has many facilities that are very suitable for the millennial generation who have a modern, active and fast-paced lifestyle. So what are you waiting for? Get the Ramadhan Blessing promo, with special prices starting from 400 million with Installments up to 60x plus Extra 12x Installments valid only for the first 30 units.⠀⠀⠀

*T&C Applicable

Click here to see the Site Progress of The Parc May 2021

Related News